|
|
Setting the drain tiles
|
|
As illustrated here, we have a bed of drain rock and are
establishing the top 'manifold' of the drain field. Notice the solid pipe
coming from the outlet of the septic tank.
|
|
|
| Once the pipe is 'set' then it is buried in drain rock
with just the top visible. This picture shows the constant use of the level to
maintain accuracy.
|
|
|
| This is the final end of the drain field. You can see the
drain pipe in varying stages of burial.
|
|
|